It's in the detail
The project consists of 2No. buildings, a 4 Storey Office building of approximately 6000m2 and a 3000m2 warehouse that is being converted to a workshop.
Stage 1 consisted of a due Diligence and a watching brief of the landlord Mechanical & Electrical installation. PMEP reviewed the landlord documentation to ensure, the installation was in line with our client’s requirements.
PMEP attended site on a regular basis to inspected the Mechanical & Electrical installation and provide bi-weekly reports to our Client on the status of the landlord &E installation. Stage 2 consisted of the traditional Mechanical & Electrical consultancy services where we provided detailed design for the CAT B fit out of the space. The full design of mechanical ventilation, air conditioning systems, comms room air conditioning, lighting & lighting controls, general services; protective services sprinkler system & EV Charging was provided.